高密垃圾焚燒發(fā)電項目1#2#爐大包網(wǎng)架工程
發(fā)布日期:2023-04-20 瀏覽次數(shù):782
工程位于山東省濰坊市高密市,建筑面積5050㎡。工程內(nèi)容包括1#2#爐大包網(wǎng)架施工安裝。
Dome space frame of boiler 1#2# for Waste-to-energy power plant, Gaomi City,Shandong Province.
The project is located at Gaomi City, Weifang City, Shandong Province, with a construction area of 5050 square meters. The project scope includes dome space frame erection for boiler 1#2# .